PRODUCT CATEGORY / 7 PUBLISHED PRODUCT SHEETS
Prefabricated Substations
Explore published prefabricated substation configurations, then define the voltage interfaces, transformer requirements and site constraints for your project.
Start with the documented model.
A prefabricated substation enquiry needs a clear scope for the high-voltage equipment, transformer and low-voltage distribution. Compare the published configurations and identify what your project needs.
- Published model information is available on this page.
- Ratings, drawings, standards and evidence are confirmed against the project brief.
Models in this family
7 published product sheets
HV/LV Prefabricated Substation
- Structure
- Three-compartment integrated (HV / transformer / LV)
- Enclosure protection
- IP44
Up to 35 kV Prefabricated Compact Substation with Dry-Type Transformer
View technical data →
Container-Based Integrated PCS with Dry-Type Step-Up Transformer
View technical data →
35 kV New Energy Prefabricated Substation
View technical data →
Up to 35 kV Prefabricated Compact Substation with Oil-Immersed Transformer
View technical data →
Container-Based Integrated PCS with Oil-Immersed Step-Up Transformer
View technical data →
Pad-Mounted Integrated PCS with Oil-Immersed Step-Up Transformer
View technical data →PREFABRICATED SUBSTATION CHECKLIST
Compare the complete project configuration.
Transformer type is one part of a prefabricated substation specification. Review the electrical duty, enclosure, site constraints and connection interfaces together before comparing quotations.
| Project decision | Information to share | What to confirm in the offer |
|---|---|---|
| Electrical scope | HV and LV voltages, frequency, required capacity, load profile and the project single-line diagram. | Transformer particulars, HV and LV functions, protection and the equipment included in the quoted assembly. |
| Transformer type | Whether the design specifies dry-type or liquid-filled equipment, and any site fire or liquid-containment requirements. | The proposed type, cooling arrangement and any site measures required by the project design or local rules. |
| Site and enclosure | Ambient conditions, altitude, indoor or outdoor use, footprint, noise constraints and access restrictions. | Enclosure characteristics, ventilation, maintenance clearances and the drawings applicable to the proposal. |
| Delivery and interfaces | Cable entry, foundation details, transport limits, lifting access and the installation schedule. | Overall dimensions, interfaces, shipping scope and installation responsibilities before order approval. |
Compare offers against the same document list.
Use the same scope when requesting a general arrangement, single-line diagram, technical schedule and applicable test evidence. Confirm document availability and revision for the exact assembly being offered.
An initial enquiry can start with the required voltages, intended capacity and installation country. Share the remaining design information as it becomes available.
Start with your requirements.
Share any available electrical duty, site conditions and required document list. Transformer capacity is only relevant where applicable.