Glaiston Power Distribution Equipment Quick Quote

TECHNICAL LIBRARY

Documents and the evidence behind them.

Read the published product sheets without registration, then follow the same evidence gates used to confirm ratings, inspection records and test scope for your quoted model.

Browse documents ↓ Quality and evidence ↓

Datasheet

Datasheet

2 documents

Cover of XDA-12(V)/630-20 Ring Main Unit — Product Sheet PDF

XDA-12(V)/630-20 Ring Main Unit — Product Sheet

PDF · 2.0 MB · 2026-11

Two-page product sheet for the 12 kV dry air insulated, SF6-free ring main unit: rated voltage, rated current, short-circuit breaking and making capacity, withstand voltages, dry air pressures, control voltage and rated operating sequence.

Cover of HV/LV Prefabricated Substation — Product Flyer PDF

HV/LV Prefabricated Substation — Product Flyer

PDF · 1.9 MB · 2026-11

Single-page flyer for the factory-assembled HV/LV prefabricated substation: three-compartment structure, IP44 enclosure, IK10 impact resistance, flyer-stated noise and enclosure-strength test values, and typical applications.

Confirm availability for your configuration.

Issued per project

01

Technical particulars

Request guaranteed ratings for the exact quoted model; confirm which values are contractually agreed.

02

Outline and single-line drawings

Ask whether drawings and cable interface details are available for the proposed configuration.

03

Type-test evidence

No model-specific type-test report is currently published here. Ask for report number, laboratory and scope before tender use.

04

Installation and O&M

Confirm the availability and revision of instructions for the exact model before order approval.

Tell us which model you are evaluating.

Send the model or family, electrical ratings and project standards. We can then confirm which documents exist for your configuration.

EVIDENCE GATES

Move from a product idea to a reviewable package.

The public starting point is deliberately small: two product sheets. Everything else is confirmed against the quoted model, manufacturing entity and project acceptance plan.

Published2 product sheets

Read the XDA-12(V) RMU sheet and HV/LV substation flyer without registration.

View documents →
Project reviewExact configuration

Ratings, interfaces, drawings and installation suitability are matched to your duty.

See review stages →
RequestReports and certificates

Ask for issuer, scope, validity, test configuration and authorization before tender reliance.

Review document policy →
  1. 01ScopeDuty and site
  2. 02ConfigureModel and interfaces
  3. 03EvidenceReports and records
  4. 04AcceptTender and FAT gates

Begin with the project specification.

Match the proposed model against your single-line diagram, electrical duty and site constraints; a product family name alone does not establish suitability.

Include in your request

  • Rated voltage, frequency, current and short-circuit requirements
  • Installation environment, enclosure and access constraints
  • Protection, metering and communication interfaces
  • Applicable standards, witness points and required submittals

NEXT STEP

Send your technical schedule.

Tell us which model, standard, report and inspection points need confirmation before your tender deadline.

Discuss evidence requirements