APPLICATIONS
Start with the application, then the equipment.
Choose a project context to identify the electrical ratings, installation constraints and documents that need confirmation. Equipment selection depends on your actual specification.
Where the Equipment Is Installed
Seven application contexts, each mapped to the equipment families that fit it.
Application context describes where equipment can be applied. It is not a project reference or a claim of sector experience.
Equipment Selection
A specification comes before a recommendation.
Application alone cannot establish whether a product is suitable. Compare your one-line diagram and tender requirements with the published product information, then ask us to confirm the project configuration.
01 / Electrical duty
State the rated voltage, current, fault level and protection requirements in the project documents.
02 / Site conditions
Confirm the installation environment, enclosure requirements, interfaces and space constraints.
03 / Document review
Review the available product sheets first; request project-specific drawings and evidence with your RFQ.
Tell us the application and the environment.
Voltage class, rated current, short-circuit level, installation environment and the standards your project is tendered against.