PROJECT · CN · SOLAR / PV

SHENERGY Xingjiang 2GW Photovoltaic Project

A photovoltaic project in Hoboksar County, Tacheng, Xinjiang, with 2 million kilowatts total installed capacity (DC-side 616.07 MWp, AC-side 498.9 MW), adopting a "photovoltaic + ecological management" model to turn desertified land into green-energy generation.

This reference is published only after written authorization and source verification for the stated scope.

SHENERGY Xingjiang 2GW Photovoltaic Project
2 GW project · 1,998 MVA substationsCapacity
36.5 kV / 0.8 kVVoltage
Solar / PVSector
CNLocation

CHALLENGE

Project context

A photovoltaic project in Hoboksar County, Tacheng, Xinjiang, with 2 million kilowatts total installed capacity (DC-side 616.07 MWp, AC-side 498.9 MW), adopting a "photovoltaic + ecological management" model to turn desertified land into green-energy generation.

SOLUTION

How we delivered

Ruibian (Jiangsu) Electric Power Co., Ltd. supplied Compact Prefabricated Substations totalling 1,998 MVA (1.998 GVA), equipped with oil-immersed transformers — primary 36.5 kV / secondary 0.8 kV — compliant with IEEE/IEC standards.

OUTCOME

Impact

Expected annual DC-side generation of roughly 800 million kWh and about 600,000 tonnes of CO₂ avoided each year.