PROJECTS / REFERENCES

Референсы публикуются только после разрешения и проверки.

We do not publish customer names, site photographs or project values without written authorization and source verification. Where both are recorded, references are published against defined pre-qualification requirements. This page explains what we can share and under what terms.

PUBLISHED REFERENCES

Authorized references approved for publication.

Завод в ОАЭ (Ближний Восток) AE · Промышленный объект

Завод в ОАЭ (Ближний Восток)

Бесперебойное и пожаробезопасное электроснабжение производственных нагрузок объекта внутри помещений.

Смотреть кейс →
Энергосеть Кении, Африка KE · Энергосети

Энергосеть Кении, Африка

Надёжное распределение электроэнергии для энергосети Кении.

Смотреть кейс →
Горнодобывающий проект Golden Mining в Канаде CA · Горнодобывающая промышленность

Горнодобывающий проект Golden Mining в Канаде

Надёжное защищённое электроснабжение, адаптированное к требованиям горнодобывающего производства.

Смотреть кейс →
Майнинг Биткоина в США US · Майнинг BTC / криптовалют

Майнинг Биткоина в США

Высокоплотное электроснабжение для непрерывного майнинга с высокой нагрузкой.

Смотреть кейс →
Проект дата-центра в Малайзии MY · Дата-центр

Проект дата-центра в Малайзии

Подстанции образуют энергетическую основу вычислительного кампуса дата-центра и поддерживают более широкое развитие Малайзии как ИИ-центра.

Смотреть кейс →
Фотоэлектрический проект SHENERGY Синьцзян 2 ГВт CN · Солнечная энергетика

Фотоэлектрический проект SHENERGY Синьцзян 2 ГВт

Ожидаемая годовая выработка по стороне постоянного тока — около 800 млн кВт·ч и около 600 000 тонн CO₂, избегаемых ежегодно.

Смотреть кейс →
Проект опреснения морской воды в КСА SA · Опреснение

Проект опреснения морской воды в КСА

Надёжное электроснабжение опреснительного завода, работающего в суровых пустынных условиях.

Смотреть кейс →

WHAT WE CAN SHARE

Three levels of reference.

Request references →
Level 1

Application and scope description

Industry, voltage class, equipment family, configuration and the standards the project was delivered to — with the customer name removed. This can be issued after source review and may support a technical evaluation.

Available on request
Level 2

Reference letter or site contact

For pre-qualification and tender submissions, we approach the customer and ask them to confirm the reference directly to you or to your client. This requires that customer consent and scope are confirmed; timing depends on the requested reference and availability.

Subject to customer consent
Level 3

Factory and production review

A visit or online manufacturing review may be arranged after the responsible manufacturing entity, scope and access have been confirmed. The review scope is agreed against your pre-qualification requirements; it does not imply an audit, accreditation or fixed production capacity.

Arranged on request

WHY REFERENCES ARE NOT PUBLIC

Confidentiality is part of the service.

Utility and EPC customers routinely require that their equipment suppliers do not publish their name, network data or site photographs. We treat project information as confidential. A reference appears on this page only after written authorization and source verification have been recorded.

A project reference should be published only when the customer has authorized the specific name, image or project detail being shown.

01

What we send for pre-qualification

Where verified and applicable: company registration, management system documents, product test evidence, quality-control procedures and completed vendor questionnaires.

02

What we need from you

The reference format your client requires, the deadline, and the name of the party who will receive the confirmation.

03

What we will not do

We will not publish a customer name, site photograph or project value without that customer’s written authorization.

СЛЕДУЮЩИЙ ШАГ

Send us your pre-qualification requirement.

Tell us the market, the voltage class, the equipment family and the reference format your client requires. We will come back with what we can evidence.

Request references