ENGINEERING / QUALITY / DOCUMENTATION

Especifique primeiro. Verifique as evidências.

Technical sheets are available for the featured RMU and prefabricated substation. Inspection records, test reports, certification scope and acceptance criteria must be verified for the exact model and project before they are treated as tender evidence.

EVIDENCE GATES

Move from a product idea to a reviewable package.

The public starting point is deliberately small: two product sheets. Everything else is confirmed against the quoted model, manufacturing entity and project acceptance plan.

Publicado2 product sheets

Read the XDA-12(V) RMU sheet and HV/LV substation flyer without registration.

View documents →
Project reviewExact configuration

Ratings, interfaces, drawings and installation suitability are matched to your duty.

See review stages →
RequestReports and certificates

Ask for issuer, scope, validity, test configuration and authorization before tender reliance.

Review document policy →
  1. 01ScopeDuty and site
  2. 02ConfigureModel and interfaces
  3. 03EvidenceReports and records
  4. 04AcceptTender and FAT gates

Begin with the project specification.

Match the proposed model against your single-line diagram, electrical duty and site constraints; a product family name alone does not establish suitability.

Include in your request

  • Rated voltage, frequency, current and short-circuit requirements
  • Installation environment, enclosure and access constraints
  • Protection, metering and communication interfaces
  • Applicable standards, witness points and required submittals

PRÓXIMO PASSO

Send your technical schedule.

Tell us which model, standard, report and inspection points need confirmation before your tender deadline.

Discuss evidence requirements